Image
Manufacturing

Preventing costly breakdowns through energised electrical maintenance

The Opportunity

Following routine audits, it was discovered that previously ‘visual only’ inspections had been done on the plant’s electrical system and that some areas had not been tested.

adi Compliance 360 was asked to do a trial inspection of one warehouse onsite in order to assess our proficiency, capabilities and cost effectiveness. The customer was particularly interested in the potential benefits of doing energised supply testing, without any supply interruptions.

Talk to us

Contact us today and we can discuss your project needs.
Request call back

Conveyor Roller Maintenance – Stacker Crane System

The Opportunity

We were engaged by one of Europe's largest manufacturers of automated racking systems to provide mechanical support for their UK after-sales service division. This particular project involved replacing 90+ rollers on a chain-driven conveyor system. The works were critical to the operational demand being placed on the end user.

Talk to us

Contact us today and we can discuss your project needs.
Request call back

Kloeckner Metals – New Build Factory

The Opportunity

Over the last 20 years, Kloeckner Metals and adi Group have built up a long-lasting business relationship.

This was developed further when Kloeckner Metals and adi discussed plans for expansion at their Black Country base to increase their business capabilities. From initial conception, we were able to work with Kloeckner on early-stage pricing all the way through to a full tender process and then being awarded the contract.

Talk to us

Contact us today and we can discuss your project needs.
Request call back

Major Lighting Upgrade, M&S

The Opportunity

To undertake a full site light replacement project from conventional T5 fluorescent lamps to LED energy savings luminaires in the M&S Castle Donington Distribution Centre. The site is 900,000 sq ft of state-of-the-art technology spread across three chambers and five floors, making it one of the largest and most efficient sites of its kind in the UK, with around two million single orders processed a week. The challenge facing adi was to safely and efficiently undertake this work around a fully operation facility, including working through peak periods.

Talk to us

Contact us today and we can discuss your project needs.
Request call back

BMS and HVAC Plant Upgrade at Marks & Spencer Head Office

The Opportunity

The building environmental conditions were poor, and was affecting staff wellness. This was attributed to an aged and faulty BMS and issues with the major plant.

The Solution

The team at adi Intelligent Buildings completed a major BMS and HVAC upgrade for Marks & Spencer at its London HQ, Waterside House, located in Paddington. The project was eight months in duration with adi Intelligent Buildings appointed as Principal Contractor under CDM regulations.

Talk to us

Contact us today and we can discuss your project needs.
Request call back

Vesuvius Foseco

The Opportunity

Working directly with the site management, we were selected to supply and install new energy efficient machinery to replace the 10 year old equivalent units.

The Solution

The new equipment selected was a full 35Kw smaller in size and was 60% smaller in regard to footprint. Embedded within this machine, are facilities to provide instantaneous alerts to the client should the new machinery require servicing or incur any issues.

Talk to us

Contact us today and we can discuss your project needs.
Request call back

Talk to us

Contact us today and we can discuss your project needs.
Request call back

Credentials

Make UK Certificate Adi Group
5% Club Platinum Adi Group
BITC
ecovadis
Outstanding to work for 2025 certificate adi group
made in midlands