The Opportunity

We were engaged by one of Europe's largest manufacturers of automated racking systems to provide mechanical support for their UK after-sales service division. This particular project involved replacing 90+ rollers on a chain-driven conveyor system. The works were critical to the operational demand being placed on the end user.

The Solution

Our 100+ plus mechanical strong team allowed us to provide 4 mechanical engineers on-site within 72 hours of receiving the initial request. Our experienced engineers worked tirelessly to complete the works within a 12 hour shift allowing the client to resume full operation.

  • Replacement of mechanical components
  • Rapid response
  • Waste management planning
  • Site and task-specific risk assessments and method statements
sugar stacking in factory

 

The Benefit

  • Resumption of full operational capacity
  • Trust in our ability to deliver resource within a short time frame
  • Enhanced the reputation of our customer to their client
quotemark

I’m very happy to hear it all went smoothly, this was really critical work for us, so very grateful to you and the team for handing it so swiftly, professionally and at such a reasonable rate given the current situation.

sugar manufacturer

Stacker Crane System, in combination with renowned sugar manufacturer.

conveyor

Full operational capacity

Resumed

up arrow

Enhanced

Reputation

Talk to us

Contact us today and we can discuss your project needs.
Request call back

Talk to us