The Opportunity
Design / Project Management / M&E
The Solution
adi were engaged to design, build and project manage a bulk chemical storage heating system. Inclusive of heated pads with fixed insulation and cladding (Polysol) and removable heated jackets (PTFE/silicone/PVC). Heating viscous material (glucose) and providing direct frost protection temperature-controlled to within ±2°C. System automatically distinguished between filling, heat up and distribution.
The Benefits
Project Value: €100K
€22K per Annum
Life Sciences
Solution provision
Removal of lost time - transfer and storage of product harmonised
Sustained processing
Continuous transfer of product within automated control tolerances and seasonal / daily adjustments to external weather conditions