Life Sciences
Seamless Laboratory Expansion for Indivior
The Opportunity
Indivior required an expansion of their existing early-stage chemistry laboratory to increase capacity. An adjacent, underutilised laboratory space was identified as an ideal location due to its proximity and existing infrastructure. However, a key challenge was to complete the expansion while maintaining business-as-usual (BAU) operations and minimising disruption to surrounding operational labs. Indivior also wanted to reduce their carbon footprint, with a focus on assessing and improving the efficiency of their nitrogen generation system.
James McCann, Senior Maintenance Engineer, STERIS
I can't speak highly enough of Simon Smith, and the whole team at adi Healy Compressors. Amazing service - they go above and beyond every time.
Walgreens Boots Alliance, Infrastructure Upgrade Project
The Opportunity
The adi Group has a longstanding relationship with Walgreens Boots Alliance and adi Electrical was competitively selected for the first phase to upgrade the old low voltage (LV) electrical distribution systems for BCM’s, grade one listed, five storey D10 Building in Beeston, Nottingham. This was a prestigious and complex project, done in partnership with English Heritage, to ensure that the work complied with the latest electrical installation and environmental legislation, whilst complementing the existing visual aesthetical look.