The Opportunity

In 2021, adi Electrical won the LV Upgrade Project at QE2 Locks in Eastham on the Wirral. Working with our long-term client, Peel Ports, adi Electrical undertook the installation of new 630A Supplies for the new Winch Houses. The existing LV infrastructure dated back to the 1950s and this was the first major upgrade since this period.

The installation was carried out within a short two-week possession period with all work and LV energisation completed ahead of schedule. Close collaboration was needed within the adi Group of companies as our Automation Division was also engaged in the control’s aspects of the project.

The Solution

adi Electrical installed over 6400 metres of 300mm SWA cabling in trenching, cables were presented and terminated within new marshalling kiosks with final sub main distribution radiating from each kiosk position. New protection equipment was installed and configured for the increase in electrical loading. Final handover and acceptance testing all completed before the possession period hand back.

trench cables

 

The Benefits

  • Strengthening of our long term relationship with the client
  • Bespoke installation meeting the clients requirements.
  • Design future proofed to include additional electrical infrastructure scheduled for 2022
Peel Ports Logo

Peel Port’s Mersey Docks, Liverpool based business manages one of the largest, busiest and most diverse ports in the UK. Working with the Manchester Ship Canal under a single management team, the Port of Liverpool is the centre of the most impressive shipping network in the UK.

plug

6,400+

Metres of 300mm SWA cabling

upgrade

First major upgrade

Since the 1950's

Talk to us

Contact us today and we can discuss your project needs.
Request call back

Talk to us

Contact us today and we can discuss your project needs.
Request call back

Credentials

5% club
BITC
ecovadis
cert b
made in midlands